Water/Sewer/Stormwater Rates for Fiscal Years 2023-2025

Note: The City of Baltimore fiscal year runs from July 1 to June 30. Rate increases take effect:

  • July 1, 2023
  • July 1, 2024
  • July 1, 2025

Rate adjustment approved

June 15, 2022, the Baltimore City Board of Estimates (BOE) approved the Department of Public Works’ (DPW) and Department of Finance’s request for a 3-year rate adjustment for monthly water, sewer and stormwater charges.

BOE approved a 3.0% increase for Water, 3.5% increase for Sewer, and 3.0% for Stormwater service. The rate adjustments represent the lowest rate increase since 1998.

FundFY 2023FY 2024FY 2025
Water3.0%3.0%3.0%
Wastewater3.5%3.5%3.5%
Stormwater3.0%3.0%3.0%

Monthly rates

The water and wastewater rate increases apply to two components, fixed charges and volumetric charges.

Fixed charge components

Every customer is charged a monthly:

  • Account Management fee to cover the costs of Customer Support. 
  • Infrastructure Fee to cover a portion of the capital costs for providing water and sewer services. This fee is based on meter size.
  • Chesapeake Bay Restoration Fee.

Monthly water billing is set by meter size and is billed until the water account at the property is formally closed. 

Variable rate components - includes volumetric charges

  • Water consumption (a volumetric charge) is charged in CCF (100 Cubic Feet). 1 CCF equals 748 Gallons. 
  • Stormwater charges are based on the amount of impervious area on a property. Impervious areas do not allow water to pass through. Examples are paved areas like sidewalks, driveways, and parking lots.
FIXED CHARGE COMPONENTS
 FY 2023FY 2024FY 2025
 WaterSewerWaterSewerWaterSewer
VARIABLE RATE COMPONENTS
STORMWATER CHARGE
Effective:July 1, 2022July 1, 2023July 1, 2024
Account Management Fee (per bill)$4.46$4.59$4.73
Infrastructure Chargeper monthper monthper monthper monthper monthper month
Meter Size  
5/8"$13.48$11.28$13.89$11.68$14.31$12.09
3/4"$24.24$20.28$24.97$20.99$25.72$21.73
1"$53.85$45.06$55.47$46.64$57.14$48.28
1-1/2"$94.22$78.83$97.05$81.59$99.97$84.45
2"$215.36$180.17$221.83$186.48$228.49$193.01
3"$376.84$315.28$388.15$326.32$399.80$337.75
4"$861.34$720.58$887.19$745.81$913.81$771.92
6"$1,547.70$1,294.79$1,594.14$1,340.11$1,641.97$1,387.02
8"$2,422.47$2,026.61$2,495.15$2,097.55$2,570.01$2,170.97
10"$3,431.84$2,871.01$3,534.80$2,971.50$3,640.85$3,075.51
12"$6,123.46$5,122.78$6,307.17$5,302.08$6,496.39$5,847.66
 per Ccfper Ccfper Ccfper Ccfper Ccfper Ccf
Volumetric Rate (all units)$3.74$9.81$3.85$10.15$3.97$10.51
   
Stormwater Charge (per ERU)$6.70$6.95$7.20
Tier 1 Residential$4.45$4.60$4.80
Tier 2 Residential:ERU$6.70$6.95$7.20
Tier 3 Residential$13.40$13.90$14.40

Impact on your monthly bill

CUSTOMER BILL IMPACTS
Monthly Charges for 5/8" meter and CcF
 FY 2022FY 2023FY 2024FY 2025
 CurrentProposedProposedProposed
Account Management Fee$4.33$4.46$4.59$4.73
Water Infrastructure Charge$13.08$13.48$13.89$14.31
Water Volume Charge$21.78$22.44$23.10$23.82
Sewer Infrastructure Change$10.89$11.28$11.68$12.09
Sewer Volume Charges$56.88$58.86$60.90$63.06
Stormwater Charge$6.50$6.70$6.95$7.20
Bay Restoration Fee$5.00$5.00$5.00$5.00
Total Bill$118.46$122.22$126.11$130.21

Additional information

Historic rate increases

HISTORIC RATE INCREASES
DateWaterWastewaterStormwater
June-988.00%8.00% 
May-0019.00%15.00% 
Apr-0216.00%10.00% 
Apr-039.00%9.00% 
Apr-049.00%9.00% 
Apr-059.00%9.00% 
Apr-069.00%9.00% 
Apr-079.00%9.00% 
May-084.00%4.00% 
June-099.00%9.00% 
Jul-109.00%9.00% 
Jul-119.00%9.00% 
Jul-129.00%9.00% 
Jul-1315.00%15.00% 
Jul-1411.00%11.00% 
Jul-1511.00%11.00%0.00%
Oct-169.90%9.90%0.00%
Jul-179.90%9.90%0.00%
Jul-189.90%9.90%0.00%
Jul-199.90%9.00%9.00%
Oct-209.90%9.00%9.00%
Jul-219.90%9.00%9.00%
Jul-223.00%3.50%3.00%
Jul-233.00%3.50%3.00%
Jul-243.00%3.50%3.00%

Fee types

FEE TYPES
DescriptionFee  
Abandonment 1 ½ “ and 2”$716  
Abandonment 1” and below$415  
Access to asset$106  
Delinquent Turn-Off$104  
Fire Flow Test$820  
Fire Hydrant Permit$191  
Fire Protection fee$168  
Meter Testing – 2$109  
Meter Testing – 2” and Below$109  
Reduce 1” Meter to ¾” Meter$262  
Reduce 1” Meter to5/8 Meter$262  
Reduce 2” Meter to 1 1/2 “ Meter$1,245  
Reduce ¾” Meter to 5/8 “ Meter$191  
Tampering Fee (1st Offense)$106  
Tampering Fee (another 1st Offense)$530  
Turn-Off-Large Meter – Above 2”$165  
Turn-off Request By Owner (small meter)$104  
Turn-on-Large Meter- Above 2”$165  
Turn-on- Request by Owner (small meter)$104  

Questions or concerns?

We're here to help. Go to Customer Support. Water customers outside of Baltimore City may dial 410-396-5352 for assistance.